Capital Improvement Project Frequently Asked Questions

Frequently Asked Questions

01 What is a Capital Project?
It is like home improvements for schools. By NYS Law, the school district inspects its property regularly, working with an architect to maintain a five-year, capital improvement plan. Some issues require immediate attention, while other repairs and upgrades can be spread out over time.
This is done in much the same way a homeowner utilizes savings or obtains an improvement loan to fund major repairs, such as a roof. For school districts, this is called a “Capital Project”. To further encourage schools to maintain or improve their facilities, SED reimburses districts through “Building Aid” for capital projects. SED pays a percentage of capital project costs, and the district pays the balance known as “Local Share”.

02 Why capital project versus operations and maintenance?
The State Education Department (SED) encourages school districts to undertake a routine schedule of capital improvements to maintain their facilities and grounds.
To further encourage enhancing schools, SED reimburses districts through “Building Aid” for capital projects (different from “Operating Aid”). SED pays a percentage of capital project costs, and the district pays the balance known as “Local Share”.
If facility construction work were to be completed out of the Operations and Maintenance budget, there would be NO STATE AID (100% Local Share).

03 Why doesn’t the District just include these items in the annual budget?
By creating a Capital Project from the work that needs to be done, the District will receive 86.5¢ back on every dollar spent. Without that reimbursement from NY State, the entire cost would rest with the local tax-payers.
Major construction cannot be absorbed into the annual budget and is best funded and paid over several years.

04 What is the cost of the project, and what is the estimated average cost to taxpayers?
The main capital project proposition has a proposed overall cost of $25,850,000. Through a combined use of state building aid, retiring debt service, and capital reserve funds, this project would not come with a tax increase.

05 Why is voter approval needed?
Voter approval is required whenever it is necessary to maintain currently levied tax amounts, increase the tax levy, and establish or expend funds from capital reserves. Money placed into capital reserves must be earmarked for specific projects, and can only be spent on those projects for which it was intended, via a voter referendum.

06 What is included and why is the project needed?
Through our ThoughtExchange, building walkthroughs, conversations with staff, and review of our facilities, several priorities consistently emerged: improved heating, ventilation and air conditioning; modernizing classrooms and learning spaces; addressing bathrooms and aging infrastructure; improving gyms and athletic facilities; and continuing to invest in safe, welcoming spaces for our students.

At Potsdam High School, the project would improve our auditorium and music spaces, provide air conditioning in the auditorium, address aging mechanical systems and bathrooms, improve lighting, and replace our aging greenhouse. At A.A. Kingston Middle School improvements would include the stage and music areas, Family and Consumer Sciences Classroom, gymnasium equipment, bathrooms, and major mechanical systems. At Lawrence Avenue Elementary School, we are proposing improvements to the gymnasium, kitchen, bathrooms, library, HVAC Systems, second-floor air conditioning, and interior courtyard. Our plans also include significant improvements to our outdoor spaces, A new multi-sport synthetic turf complex would provide opportunities for baseball, softball, soccer, football and lacrosse while allowing us to make important improvements to stormwater management and floodwater mitigation. Improvements to Stevie’s Trail would further expand opportunities for students and community members to enjoy our campus.

07 Why now?
The district has benefitted from successful projects over the past several years and is positioned to continue with that momentum. With responsible planning and established capital reserves, Potsdam Central School District can leverage funds to harness state aid in order to execute capital construction that is outside the means of the annual operations budget.

Over time, our facility needs will continue to grow, not diminish or go away. We don’t expect SED’s contribution to capital project costs to get any better than they are right now.

We also know that construction costs continue to escalate with each passing year.

If we choose to wait and pursue the same project in the future, we would expect the cost to the taxpayers to be higher.

08 What happens if the Capital Project is NOT Approved?
Costs could go up. The financing for this project will allow Potsdam Central School District to spread payments for the work over several years to correspond with the building aid that we receive from the State. If voted down, several of the items will need to be addressed in the annual operating budget thus taking funds away from our academic programs and overall operations. Other items such as the mechanical items will continue to deteriorate leading to continued high maintenance costs.
Items paid for out of annual budget would generate NO State Building Aid (100% local share).

09 Isn’t State Aid just my tax dollars too?
Yes, it is. The New York State Legislature has given all Districts in the state an opportunity to use tax dollars to enhance their communities through school building improvements and renovations. This is an opportunity to keep some of those tax dollars in our own community and improve the educational setting for our children at a lower cost.

10 Will there be any surprise costs after the voting?
No. We are asking the voters to approve the maximum borrowing that is needed for this project. The cost can only be lowered after the vote.

11 If the project is approved by voters, when will the work be completed?
After voter approval, the plans and specifications will need to be completed by the architects and engineers and will be submitted to New York State for approval (SED issues our “building permit”). This process and approval from the state can take up to a year.

Although construction work starting is dependent on SED approval, we anticipate construction beginning in the Spring/Summer of 2028, taking place over the duration of two summers.

12 How can we learn more about the project? What if we have additional Questions?
We encourage the community to attend a Public Information session on December 8, at 6:00 pm, in the PHS Multipurpose Room. Additional information can be found on the District’s website at Potsdamcsd.org, as well as contacting the Superintendent, Business Official or any Board Member.

13 Will this project complete our capital improvement needs?
Not indefinitely. Buildings and grounds continue to age and see consistent use by students, staff and members of the public. In fact, several items that were considered for this capital construction project will have to wait for a future project in order for us to properly manage cost and minimize the current impact to taxpayers. In addition, as time passes, wear on surfaces and constant exercise of everything that is mechanical lends to deterioration over time that must be anticipated for replacement in the future. At the urging of SED, we plan to embark on a routine program of capital improvements, maximizing our State Aid. Acting with fiscal responsibility, we wish to minimize the cost to our taxpayers, while maintaining safe, healthy and appropriate learning environments for our students, staff and community.

14 Will construction work on site at the school campus affect the stormwater runoff and impact neighboring properties?
A critical feature of this capital project is a major upgrade to our campus water management infrastructure. To protect our grounds and surrounding neighborhood from severe weather, the project plan includes an advanced underground stormwater retention system, within the confines of the synthetic turf field, and adjoining bioretention areas. During heavy rain, this subterranean network captures surface runoff and stores if safely before releasing it at a slow, controlled rate into the local watershed. By improving campus drainage, this vital component reduces flooding risks, prevents soil erosion, and enhances environmental resiliency across our entire site.

15 Is athletic field work a necessity for district, or just a luxury item?
With the current limitations of land area for fields and limitations of natural grass and clay infield baseball and softball, work to improve the fields is needed. With current field conditions, we often must cancel or postpone games after minor rain events. The proposed project will introduce an additional field to allow the ability to host more simultaneous games and not have to bus modified sports teams off site to accommodate normal annual athletics needs. As we have experienced with our other synthetic turf field, we will also be able to accommodate earlier season play and much more overall play time per field due to added durability and drainage. All natural advantages of the new fields may also extend to the area’s usage for recess and physical education classes for students.